Need an electrician in Al-Kakiyah who understands that the shop downstairs and the home upstairs often share one board and some tired old cable? We send a technician who works on homes, workshops and shops across the district: a breaker that trips the moment the compressor starts, a hot socket behind a sewing machine, a camera system that stopped recording, or a board that has simply been asked to carry too much. Call or WhatsApp 0565564857. We take calls 24 hours a day.
At Gulf Al-Arab we treat Al-Kakiyah as what it is: a district where people live and work on the same street. A carpentry or metal workshop sits next to a family flat; a small shop with a lit sign has rooms above it. That mix means a fault in the workshop can black out the home, and one wrong breaker choice can turn into heat inside a wall. For the full range of home electrician in Makkah services, see the main page; here we focus on what keeps coming up in Al-Kakiyah itself.
Al-Kakiyah electrics at a glance
- Where we work: homes, small workshops, shops, and homes built onto shops
- Most common jobs here: breakers tripping when machines start, overheating cable, crowded boards, cameras not recording
- How to book: call or WhatsApp with a photo of the board or the machine that causes the trip
- Price: agreed after diagnosis and before any work; you pay after testing
- Guarantee: workmanship guarantee on the work done; ask the technician about its period
Why electrics in a mixed home-and-workshop district behave differently
In a purely residential street, the biggest loads in a house are the air conditioners, the water heaters and the oven. In Al-Kakiyah you add an air compressor, a welder, a power saw, chilled display fridges in the grocery, and a shop sign that stays lit all night. These machines do not just use a lot of power; at the moment they start, motors draw several times their running current. That is why a breaker “trips for no reason” even though the total load looks reasonable on paper.
The second issue is history. Many shops and workshops started life on a normal house installation, and loads were bolted on over the years: a socket here, a cable clipped along the wall there, an extension lead to the back of the workshop. Eventually nobody knows what each breaker feeds, and some cables are thinner than the load they now carry. Nothing fails on day one. It shows up later as a smell of hot plastic or a socket that has turned brown.
Motor start-up current
A breaker sized for lights and sockets dislikes that start-up surge and trips. The fix is never just “put a bigger breaker in”, because the cable behind it may not cope. We read the machine’s rating plate, size the cable for its length and load, fit a breaker with a trip curve suited to motors, and usually give the large machine its own circuit from the board so nothing else shares it.
Separating the shop from the home above it
Where the home sits above or behind the shop, we recommend at least a separate sub-board for each, even on a single meter. The benefit is practical: a workshop fault no longer switches off the family fridge and the bedroom AC, and you can isolate the whole shop with one switch when you close at night. Splitting meters or raising the contracted capacity is the Saudi Electricity Company’s side; we prepare everything inside the building and tell you exactly what to ask them for.
Balancing the three phases
Larger shops and homes often have a three-phase supply. When every machine ends up on one phase, that phase runs hot and trips while the other two sit half empty. We measure current on each phase with the machines running, then move circuits inside the board until the load evens out. It sounds minor, and it solves a surprising share of repeated tripping while taking heat off cables and breakers.

Heavy loads in Al-Kakiyah: what each one needs
This table sums up what we see in the district’s workshops and shops. It does not replace a visit, but it tells you where the trouble usually lies:
| Machine or area | What it needs electrically | The mistake we often find |
|---|---|---|
| Air compressor or workshop pump | Its own circuit and a breaker suited to motor start-up | Run from an ordinary socket on a long extension |
| Welder | A proper industrial socket, adequate cable and earthing | Bare cable ends pushed into a socket |
| Display fridges and freezers | A dedicated circuit and over/under-voltage protection | Several fridges on one socket |
| Car wash or wet floor | A sensitive RCD and weatherproof sockets | Ordinary open sockets near water |
| Shop sign and facade lights | A timer or photocell and its own breaker | Sign cable taken from the nearest indoor socket |
| Home attached to the shop | Its own sub-board, RCD for bathrooms and kitchen | Home and shop on the same breakers |
Worth knowing: an RCD (earth-leakage breaker) does not protect against overload. It trips when current leaks to earth or through a person. A workshop needs both: an overload breaker on every circuit and RCD protection for wet areas and metal equipment people touch.
Security cameras for Al-Kakiyah shops and homes
After fault repairs, the job shop owners ask us for most is installing cameras or reviving a system that has stopped. In a commercial street a camera is not a luxury: the shop owner wants to see the door, the till and the storeroom; the family upstairs wants to know who stopped at the gate or went near the car.
- Angles before hardware: we walk the site with you and decide where a wide view is enough and where you need a camera that can identify faces at the door.
- Cable in conduit: no cable left baking in the sun on the wall surface; it runs in conduit or closed trunking to the recorder.
- A recorder that never loses power: many systems die because the recorder shares a socket that is switched off with the shop lights. We give it a permanent supply and can add a small backup battery.
- Night vision that works: cameras are aimed away from the sign’s glare so the night picture is not washed out.
- Viewing on your phone: we connect the system and set up the app before we leave, and show you how to pull up a given day’s footage.
How many days of footage you keep depends on the recorder’s disk, the number of cameras and the picture quality. We explain that at installation so you do not discover, after an incident, that the clip you needed was overwritten.

From the field: send a close photo of your board plus a photo of the rating plate on the machine that trips it. From those two pictures we can usually tell the machine’s power and the breakers you have, so the technician arrives with the right parts first time.
One electrician for the shop and the home
Send us the location, the type of place (home, workshop or shop) and a photo of the fault. We will give you the real arrival time and book the visit.
WhatsApp 0565564857Call 0565564857Home electrician in Al-Kakiyah: everything else we do
Our visits here are not only about workshops. These are the jobs Al-Kakiyah residents call us for most; each one is explained in detail on our electrician in Makkah main page:
Short-circuit detection
Thermal camera and insulation tester to locate the fault without random breaking.
Boards and breakers
Replace failed breakers, add RCD protection, label circuits and balance loads.
Sockets and switches
Replace burnt or loose ones and add new points in rooms and shops.
Lighting
Spotlights, chandeliers, hidden LED, shop fronts and signs.
AC and water heaters
Dedicated AC circuits with their own breaker; heater connection and thermostat checks.
Kitchen and fans
Oven, hob and hood circuits, ceiling and exhaust fans.
Cameras and intercom
Installing and servicing CCTV, doorbells and intercoms.
Wiring and rewiring
First and second fix for annexes and flats, rewiring old homes with minimal breaking.
How a visit works in Al-Kakiyah
- Call or WhatsApp and tell us whether it is a home, shop or workshop.
- Send a photo or short video: the breaker that trips, the burnt socket, or the camera screen that went blank.
- We book a time and send someone the same day where possible, telling you the real arrival time.
- The technician arrives with a tester and thermal camera and, in a workshop, measures the load with machines running.
- He explains the cause and agrees the price with you before starting.
- The repair is done with genuine parts, or with parts you buy yourself if you prefer.
- Everything is tested in front of you, and you pay once it works as it should.
For workshops we prefer to visit while the machines are running, because many faults simply do not show in a switched-off building. If your shop closes at a set hour, tell us and we will time the visit around it.
How we price a job in Al-Kakiyah
We do not publish fixed figures because electrical work varies hugely: swapping a breaker in a flat takes minutes, while the same breaker in a workshop may need a new cable run from the board to the far end. Even “install a large chandelier” can mean, in some homes, a lift and three days of assembly. So the price is set once the electrician sees the job, in person or as a photo or video on WhatsApp, and it is agreed with you before any work starts.
| Job | What sets the price |
|---|---|
| Fault finding and repeated tripping | Where the fault is, and whether it shows with machines running or must be traced inside walls |
| Breaker swaps or adding an RCD | How many breakers, which type, and the space left in the board |
| New board for a shop or home | Number of circuits, three-phase supply, splitting shop from home |
| Dedicated line for a machine or AC | The load, the cable length from the board and the route |
| Sockets, switches and shop-front lights | Number of points, the fittings, concealed or surface wiring |
| CCTV | Number of cameras, cable runs, the recorder and its disk size |
| First fix of an annex or flat | Size, number of points and room layout; quoted after a site visit |
Send a photo of the job on WhatsApp and in most cases we can give you the price before the visit.
Safety in the workshop and shop
Workshops collect sawdust, metal filings and oil, and any of these near a hot socket or bare conductor raises the fire risk. Keep it simple: no daisy-chained extension leads, no cables across the floor where trolleys and feet go, and never two large machines on one socket.
- Keep dust and shavings away from the board and sockets, and never stack stock in front of the board.
- If a breaker trips again and again, stop resetting it. It is a warning, not a nuisance.
- Large metal tools and welding benches need a sound earth connection.
- In the attached home, fit socket covers if there are children; they often play near the shop too.
- Do not keep a water extinguisher by the board; electrical fires need CO2 or dry powder.
If you smell burning: switch off the main breaker first, stop the machines, and never throw water on an electrical fire. Keep away from the board if smoke is coming out of it, call Civil Defence if there is a flame, and call us to find the cause once the place is safe.
The Saudi Building Code sets general requirements for electrical installations in residential and commercial buildings, including earth-leakage protection and earthing. We work to that standard and will tell you plainly if anything on your board or wiring needs changing to be safe.
Nearby districts we also cover
Our call and WhatsApp number, 0565564857, is the same across Makkah. We also cover Al-Rusaifah with its multi-storey blocks, Al-Nawariyah with its villas and rest houses, and Al-Sabhani, which mixes homes and shops much like Al-Kakiyah. If your shop is in one district and your home in another, tell us and we will try to fit both visits into one day.
Searching “electrician near me” from inside Al-Kakiyah? We send the nearest available technician and tell you honestly how long the drive will take, because rush-hour traffic is a different story from early morning.
Call before a small fault grows
Diagnosis and price before work, payment after testing. We answer calls 24 hours a day.
WhatsApp 0565564857Call 0565564857


